Disclamer

Any person reading this text (Receiving Party) shall not disclose and / or copy the information herein published without the express consent from the Issuing Party, except to directors, managers and employees of the Receiving Party who must participate in the analysis of the Investment Opportunity. The Receiving Party shall be responsible for the use of the information by said persons, and for said persons to know the applicable confidentiality obligations.

While the information provided is considered accurate and reliable no statements, express or implied, about its accuracy and completeness are made. No information contained in this presentation is or should be considered as a promise or representation about them future.

This presentation is not intended as the basis for any investment decision and should not be considered a recommendation. Each person concerned or who receive this presentation should draw their own conclusion from the data presented.

Acceptance of this document implies consent to and knowledge of the above conditions.

IMPORTANT OLIVE -GROWERS

INDUSTRIAL PLANT

IN CATAMARCA PROVINCE

THE FIELD

The field has 7.074 hectares in Capayan Department, on the foothill of Ambato Hill. 600 of those hectares are cultivated with the folliwing plantations:

  • 540 hectares of olives.

  • 40 hectares of citrus

  • Forestry and almonds 20 hectares.

  • There are also 200 hectares deforested and leveled.

Nearly 2.500 hectares of field with degraded mount is suitable for cattle.

The rest of the field surface (3.700 hectares) is a highland zone and has a stable quality for cattle exploitation.

The kind of field is the one which is called “highlands and pockets”.  The presence of highlands brings the formation of micro weathers because of its orientation and difference in heights. It allows to say that it has limited probabilities to suffer hailstones and frosts.

In the case of frosts, given the fact that the land has a favorable slope of a 3 % if a frost occurs it will last a very short time. In the last 20 years, the average was 12,7 days with frosting each year. It is highly unprovable that late frosting happens.

INSTALATIONS

It counts with accommodation for 200 persons that have access to the place temporally in the harvest time. It is a building of 450 square meters , everything built in masonry. (It can be seen in the photograph we call West Shelter)

There is a total of 7 buildings built in masonry with parabolic roofs of galvanized plates (It can be seen in one of the photographs of this page that we call Medium Shelter) that comprises a surface of 1.850 square meters and a building of offices of 150 square meters with tar paper. And finally, there is a country house of 450 square meters that is the permanent home of the engineer in charge of the technical part of the houses.

BUSINESS GROUP SYNTESIS

In the Argentina Republic called NOA (Spanish acronym for Argentine Northwest) more exacty in Catamarca Province, at 30 km of its capital city, San Fernando del Valle de Catamarca, on National Route 38 km  550,5, between the localities of Miraflores and Huillapima, in Capayan Department, on the foothil of Ambato Hill are located 9 country houses with an area of 786 hectares for each one, for mixed crop-livestock production.

At 200 km distance of Belgrano Charge´s Railway Puerto Seco Break.

The total area the group has is 7074 hectares. It is divided in 6 public limited companies.

ACCESS ROAD

All the field is demarcated with perimeter 5 thread wire fence with posts made with quebracho wood. Then, there is an internal wire for the plantations in order to avoid the access of cattle.

OLIVES VARIETY
MANZANILLAS

Manzanilla Real or Fina 80 hectares. 20 has of plantation of 6 X 5 meters and 60 has of plantation of 7 X 4  meters. A total of 27.800 plants of a variety with a double purpose. Olives for the table and for oil. 

BARNEAS

52 has of Barnea plantation of 7 X 4 meters. A total of 18.300 plants of an oily variety.

CORATINAS

160 hectares of Coratinas. 33 has of plantation of 8 X 5 meters. 70 has of plantation of 6 X 5 meters. 57 has of plantation of 7 X 4 meters. A total of 51.600 plants of an oily variety.

ARBEQUINAS

239 hectares of Arbequinas. 110 has in a plantation of 6 X 5 meters. 75 has of plantation of 8 X 5 meters. 54 has of plantation of 7 X 4 meters. A total of 74.400 plants of an oily variety.

WEST PLANTATION
FILTERING

Each deep water well has its plant to filter the water which is later impulsed by PVC pipes upto the drip irrigation devises.

The average output is 40 kg of olives per plant in a year. And the average output of oil is around 16%. This has been considered historical in 12 years of production.

There are also 40 hectares planted with citrus (red grapefruit, tangerine and orange).

3 hectares of almond trees.

All of them with watering by drip irrigation with a PVC piping under the soil.

All the plantation is divided in lots of 5 hectares with the correspondent firebreaks of 30 m wide and the streets are consolidated and with gravel. There is a total of 70 km of internal roads which are walkable in any time of the year.

POST FOR ENERGY MEASURING

Electric power supply is in medium voltage line. There are 7 potency transformation with transformers of 315 KVA each one. The power lines that is their own is a line of 10 km with medium voltage. It has been made whith cocrete posts of 15 m height each one on 1.000 m and each 100 m post of eucaliptus wood.

WELLS OF THE LAND

In the image there is a red line that marks the  approximate delimitation of the lands which limits at the West with the mountains. It means the Concepción River pass through the field and its flow can be used to water without the need to ask any authorization.

RESERVOIR

At 1.300 m from entering the field, West direction from Well 3 there is a water reservoir which re-impulses water from the river towards a booster in order to water the area that is at the West.

BOOSTER TRANSFORMER

There are drilling inter connected with PVC pipes.

From Well 7 to 6 with a pipe of a 160 mm diameter.

From Well  2 to 4 with two inter connexions of 180 mm diameter pipes.

From Well 1 to 6 with a pipe of a 225 mm diameter.

From Well 3 to 6 with a pipe of a 225 mm diameter.

© 2023 hecho por Esfera Construcciones. Hecho con  Wix.com